[1]
Dorji, C., Sharma, D. and Wangpo, Y. 2022. Modeling and Simulation of Basochhu Hydropower Plant: Islanding Operation Using Real-Time Performance Data. Bhutan Journal of Research and Development . 11, 1 (Jun. 2022). DOI:https://doi.org/10.17102/bjrd.rub.11.1.025.